|
Ian's
Garden Railway
|
|
Sn3½ NZR Layout |
![]() How about starting the railway here? |
![]() First, remove unwanted
plants and weeds |
![]() First version under
the water race |
![]() Truss bridge ready to receive track connection |
![]() Water races in position and crossing loop installed |
![]() A full yard on an
early running day. |
![]() Boulder station building
being craned into place |
![]() Time for a natter |
![]() Work train ready to
leave |
![]() Another work train
passes through Boulder |
![]() Passenger train on the
Lake George loop |
![]() At the top of Lake
George Loop |
![]() A pause for a crossing |
![]() |
|
Clearing the site for Boulder Station on the Culcreuch Fold Garden Railway
|
Platform facing and building in place. Backfilling of platform in progress
|
|
|
|
|
Job done. Gear packed away and just waiting for the loader to be collected |
Night has fallen and the lights are on. Those two are still at the table. Been there all day |
![]() |
|
![]() "Grand Pa's House and orchard |
![]() Another work train |
![]() A visiting Tram Car |
![]() Still another work train |
![]() |
Last seven photos taken by John Robinson during Wellington Garden Railway Group Running Day on 2 December 2007 |
![]() Realignment of Boulder Station yard |
![]() Boulder Station building reinstated. Platform lights to be reinstalled after holiday break |
![]() Proposed extension marked out |
![]() Site where tracks will cross |
![]() Ground to be cleared for crossing between two gardens |
![]() The crossing |
![]() January 5 2008. Start of extension |
![]() January 6 2008. Digging for crossing neatly complete |
![]() Reinforced concrete crossing laid |
![]() Track laid to second garden |
![]() Ah! To be able to work on the shade |
![]() Base course laid ready for leveling |
![]() After the crossing the tracks cross |
![]() Track laying continues |
![]() Steady progress is made |
![]() One more section today |
![]() The end of the day |
![]() John Robinson helps with track base preparation |
![]() Nearly ready for base course |
![]() Base course laid ready for leveling |
![]() The track laying commences using 3.6 metre lengths of NZ track |
![]() Using these lengths track laying goes ahead quickly |
![]() Ready to start laying the crossing loop |
![]() Crossing loop laid and track ballasted |
![]() Watering the ballast in place |
![]() John's scratchbuilt Dubs A and train make a test run |
![]() The L G & B Passenger train makes it's first run |
![]() The 90o crossing safely negotiated |
![]() The Official opening of the new extension with invited guests |
![]() Now to start on the bridge |