Ian's Garden Railway
Home  Family   Ann's Interests

    Sn3½ NZR Layout

More Photos

Started in November 2005.  Progress to 21 January 2008

How about starting the railway here?

First, remove unwanted plants and weeds

First version under the water race

Truss bridge ready to receive track connection

Water races in position and crossing loop installed

A full yard on an early running day.

Boulder station building being craned into place

Time for a natter

Work train ready to leave

Another work train passes through Boulder

Passenger train on the Lake George loop

At the top of Lake George Loop

A pause for a crossing



Clearing the site for Boulder Station on the Culcreuch Fold Garden Railway

 

Platform facing and building in place.  Backfilling of platform in progress

 

Job done.  Gear packed away and just waiting for the loader to be collected

Night has fallen and the lights are on. Those two are still at the table.  Been there all day

"Grand Pa's House and orchard

Another work train

A visiting Tram Car

Still another work train

Last seven photos taken by John Robinson during Wellington Garden Railway Group Running Day on 2 December 2007

Realignment of Boulder Station yard

Boulder Station building reinstated.  Platform lights to be reinstalled after holiday break

Proposed extension marked out

Site where tracks will cross

Ground to be cleared for crossing between two gardens

The crossing

January 5 2008. Start of extension

January 6 2008. Digging for crossing neatly complete

Reinforced concrete crossing laid

Track laid to second garden

Ah! To be able to work on the shade

Base course laid ready for leveling

After the crossing the tracks cross

Track laying continues

Steady progress is made

One more section today

The end of the day

John Robinson helps with track base preparation

Nearly ready for base course

Base course laid ready for leveling

The track laying commences using 3.6 metre lengths of NZ track

Using these lengths track laying goes ahead quickly

Ready to start laying the crossing loop

Crossing loop laid and track ballasted

Watering the ballast in place

John's scratchbuilt Dubs A and train make a test run

The L G & B Passenger train makes it's first run

The 90o crossing safely negotiated

The Official opening of the new extension with invited guests

Now to start on the bridge